Back to results
Water SA Manuscript

Full-scale implementation of external nitrification biological nutrient removal at the Daspoort Waste Water Treatment Works

Published: 2004
Authors: van der Merwe RJ, Wentzel MC, Ekama GA, Snyman JS, Esterhuyse CM, Saayman GB, Muller AW

Abstract

In the external nitrification (EN) biological nutrient removal (BNR) activated sludge (AS) system, the nitrification process is removed from the main BNRAS system to a fixed media system external to the AS system (Hu et al., 2003). The ENBNRAS system provides considerable advantages over the conventional BNRAS system, e.g. reduced bioreactor volumes, secondary settling tank surface area and oxygen demand. Further, the ENBNRAS system provides opportunity for substantial system intensification. The performance and characterization of the ENBNRAS system has been successfully demonstrated at lab-scale (Hu et al., 2000, Sötemann et al., 2002), but has not yet been tested in full-scale implementation. In collaboration between the City of Tshwane Metropolitan Municipality (CTMM) and the University of Cape Town, ENBNR activated sludge is being implemented at fullscale at the Daspoort Waste Water Treatment Works (DWWTW) in Central Pretoria, South Africa. This paper describes the preliminary design of this full-scale plant and initial implementation.

Authors

vdMR
van der Merwe RJ
WM
Wentzel MC
EG
Ekama GA
SJ
Snyman JS
EC
Esterhuyse CM
SG
Saayman GB
MA
Muller AW

Access Report

Free download · PDF format

Related Research